黄色福利院,成人免费午夜,九色91,在线国产网址,色戒网,美日韩一区,久久爱另类一区二区小说

CONTACT US    

Nantong JunHai Machinery Tech. Co., Ltd.
Address: Taoyuan Town, Rugao City, Jiangsu Province High-tech Industrial Park
Zip Code:226400
TEL:+86 18912208346(Mr Tony)

          +86 13646196569,

         +86 0513-88541237
FAX: +86 0513-88541237 / 88541236
E-mail:ntjhjx@163.com
Q Q: 1404732482

MSN:  ntjhjx@live.com

NEWS

Hoist motor maintenance
 

The motor is an important part of the winch, winch is also the most expensive parts, if damaged, repair or replacement costs that would be too high. So here we remind customers to take good care of the windlass or winch motor. Maintenance methods are as follows:

1、使用環(huán)境應經(jīng)常保持干燥,電動(dòng)機表面應保持清潔,進(jìn)風(fēng)口不應受塵土、纖維等阻礙。

1, the use of the environment should be kept dry, motor surface should be kept clean, Menorca should not receive dust, fiber and other obstacles.

2、當電動(dòng)機的熱保護連續發(fā)生動(dòng)作時(shí),應查明故障來(lái)自電動(dòng)機還是超負荷或保護裝置整定值太低,消除故障后,方可投入運行。

2, when the motor thermal protection continuously happen when, should find fault from motor or overload or protection device setting value is too low, eliminate malfunction, can be put into operation.

3、應保證電動(dòng)機在運行過(guò)程中良好的潤滑。一般的電動(dòng)機運行5000小時(shí)左右,即應補充或更換潤滑脂,運行中發(fā)現軸承過(guò)熱或潤滑變質(zhì)時(shí),液壓及時(shí)換潤滑脂。更換潤滑脂時(shí),應清除舊的潤滑油,并有汽油洗凈軸承及軸承蓋的油槽,然后將ZL-3鋰基脂填充軸承內外圈之間的空腔的1/2(對2極)及2/3(對4、6、8極)。

3, should ensure good lubricating motor during operation. General motors run for about 5000 hours, should complement or replace grease, bearing overheating or lubrication modification found in operation, the hydraulic timely for lubricating grease. Replacing the grease, should remove old lubricating oil, and the oil tank of gasoline to clean the bearing and bearing cover, then the ZL-3 grease filling the cavity between the inner and outer ring of the bearing 1/2 (2 pole) and 2/3 (4, 6, 8).

4、當軸承的壽命終了時(shí),電動(dòng)機運行的振動(dòng)及噪聲將明顯增大,檢查軸承的徑向游隙達到下列值時(shí),即應更換軸承。

4, when the bearing life end, motor running vibration and noise will increase obviously, check the radial clearance of the bearings to the following values, i.e.replace bearings.

5、拆卸電動(dòng)機時(shí),從軸伸端或非伸端取出轉子都可以。如果沒(méi)有必要卸下風(fēng)扇,還是從非軸伸端取出轉子較為便利,從定子中抽出轉子時(shí),應防止損壞定子繞組或絕緣。

5, removing the motor, from the shaft extension end or end of rotor can be taken out. If it is not necessary to remove the fan, or from a shaft extension end out rotor is more convenient, from out of the rotor in the stator, stator winding insulation should prevent damage or.

6、更換繞組時(shí)必須記下原繞組的形式,尺寸及匝數,線(xiàn)規等,當失落了這些數據時(shí),應向制造廠(chǎng)索取,隨意更改原設計繞組,常常使電動(dòng)機某項或幾項性能惡化,甚至于無(wú)法使用。

6, the replacement of winding must take note of the primary winding form, size and number of turns, wire, when the loss of the data, should ask factory, arbitrarily change the original design of the motor winding, often one or several performance deterioration, and even can not be used.

Copyright © 2014 Nantong City, Jun Hai Machinery Technology Co., Ltd.Copyright © 2014 Nantong City, Jun Hai Machinery Technology Co., Ltd.
游戏| 伊川县| 三穗县| 松溪县| 福安市| 新化县| 洞口县| 肃南| 长乐市| 永新县| 米易县| 崇文区| 南康市| 资中县| 乡城县| 都江堰市| 马尔康县| 桃园市| 腾冲县| 宁津县| 含山县| 文山县| 吉安市| 海林市| 乡宁县| 安岳县| 郓城县| 北宁市| 阿合奇县| 广灵县| 涟水县| 奉贤区| 新河县| 上林县| 东乡族自治县| 宣化县| 九寨沟县| 灵川县| 雷州市| 南溪县| 固阳县|